You don't have javascript enabled. Good luck with that.
Pencarian
Breakwater di Pulau Panggang di Perbaiki

Breakwater in Panggang Island Repaired

12 personnel from Seribu Islands Water Resources (SDA) Dept. repair breakwater on the north side of Panggang Island. The repair is targeted to complete by the end of October.

We evaluate cubes arrangement to strengthen the embankment. Because recently high waves are often appears

Seribu Islands Water Resources Dept. Head, Ahmad Saiful said, these two days his side has repair the broken embankment on the north side of Panggang Island due to hit by east wind waves in last August.

"There are five damaged breakwater locations, which has length around 400 meters. Personnel has started to compile disorganized cubes within this two days," he explained, Thursday (9/14).

Breakwater on East Side of Panggang Island Repaired

He said, his side repairs it by rearranging the cubes and switches the arrangement pattern from 432 pattern into pyramid pattern. His side hopes this pattern is more stronger to block high waves.

"We evaluate cubes arrangement to strengthen the embankment. Because recently high waves are often appears. It is targeted to finish this October," he closed.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1127 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing